EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Whammdyne1
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (136)
Avionics
- (4)
-
Just time
-
It's alive!
-
CAN bus, LRU'S and...
-
Instrument panel,...
Controls
- (3)
-
Flap actuator and...
-
Controls, sections...
-
Installed the rudder...
Empennage
- (64)
-
Completed the tail cone
-
Tailcone 10.20.2
-
Tailcone 10.19.2
-
Tailcone dimpling...
-
Tailcone 10.16.3
-
Tailcone 10.16
-
Tailcone 10.16.1
-
Tailcone through 10.14
-
Tailcone 10-13.5
-
Tailcone 10-11.2
-
Tailcone 10-10.1
-
Tailcone 10.7
-
Tailcone 10-7.4
-
Tailcone 10-7.3
-
Tailcone 10-7.3
-
Elevators and trim...
-
Elevators 9-19 Left...
-
Trim Tabs 9-17.8
-
Tailcone 10-5
-
Tailcone 10-5.2
-
Tailcone 10-4
-
Tailcone 10-2
-
Elevators 9-17.7
-
Elevators 9-16
-
Elevators 9-15,...
-
Elevators 9-14-6
-
Elevators thru 9-12
-
Elevator 9-11
-
Elevators 9-11-3
-
Elevators through 9-9
-
Elevators 9-6
-
Elevators 9-5
-
Elevators 9-4
-
Elevators start 9-2
-
Rudder fairing...
-
Rudder fairing...
-
Rudder Lower Fairing...
-
Rudder lower fairing...
-
Rudder - completed
-
Rudder - spar 7-10
-
Rudder riveting
-
Rudder...done dimpling
-
Workin' the Rudder
-
VS 6-6-10, Completed
-
VS through 6-6-3
-
Vertical Stabilizer
-
HS Completed
-
HS...a riveting time
-
HS continued riveting
-
HS dimpling away
-
HS Dimpling and stuff
-
HS parts preparation
-
HS 8-9 completed
-
HS Skins and spars
-
HS forward spar
-
HS forward spar
-
HS spars and stringers
-
HS stringers
-
HS-1008 brackets
-
Horizontal...
-
Inventory
-
The empennage arrives
-
Empennage kit purchase
Engine
- (11)
-
Mounted the engine
-
Engine Testing at...
-
Finished engine...
-
Assembled the bottom...
-
New Old Stock vacuum...
-
More part arrived
-
More overhauled...
-
Propeller Governor...
-
Parts shipping and...
-
The Crankcase arrives
-
The crankshaft arrives
Firewall
Fuel System
- (1)
-
Installed fuel...
Fuselage
- (9)
-
Completed the cabin...
-
Completed aircraft...
-
Fuselage, Baggage...
-
Completed Upper Cowl...
-
Brake lines, Section 36
-
Steps installation
-
Milestone: Completed...
-
Quick Build Fuselage...
-
Quick Build Fuselage...
Inspection
Instrument Panel
Interior Finish
Landing Gear
- (2)
-
Installed the...
-
Matco Wheels &...
Lighting
Paint / Decals
Propeller
- (1)
-
The propeller arrives!
Admin
- (9)
-
Paint Scheme
-
Electrical Routing...
-
Bought door latches...
-
Cee Bailey Windows
-
Pedal Set
-
Quick Build Wings...
-
The Baron is sold
-
Upgrades over...
Tools
Wings
- (26)
-
Right wing completion
-
Right wingtip
-
Right wing bottom skin
-
Wiring and fairings
-
Wiring and servo
-
Constructed and...
-
Gap fairings,...
-
Right wing fuel tank...
-
Finsished up inboard...
-
Wingtip wiring and...
-
Wingtip split TE and...
-
Left wing tip
-
Pitot leak test
-
Bottom skin and...
-
pitot mount...and stuff
-
Pitot mount, hoses...
-
Pitot mount, hoses...
-
Wires, fairings and...
-
Pitot mount and gap...
-
Actuator Controls
-
More actuator work....
-
Aileron Actuator
-
Left wing and fuel tank
-
QB Wing inspection
-
Aveo Engineering...
Workshop
- (5)
-
Move wings and HS to...
-
Upgraded milling vise
-
Van's Aircraft Shop...
-
Setting up the...
-
Fuselage Cradle
Electrical
- (1)
-
Battery box for dual...
Builder Name:
Ron Gawer
-
Project:
Vans - RV-10
Total Hours:
833.1
Total Flight Time:
Start/Last Date:
Dec 08, 2020 - No Finish Date
Engine:
IO-540-X
Propeller:
WW 330-3B-A/78G-78-S-R
Panel:
Garmin G3X
Friendly URL:
https://eaabuilderslog.org?s=Whammdyne1
Home or Last Project Picture
Apr 16, 2021
VS through 6-6-3
- (4.3 hours)
Category: Empennage
Finished all preparation, dimpling and rudder bracket mounting. Riveted the skeleton and forward half of skin up to the front spar.
IMG_7086.jpg
IMG_7087.jpg
IMG_7088.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.